Assistant Manager Inspection
Date: 22 Oct 2026
Location: Karachi, PK
Company: KE
Our employees are our company's greatest asset - they are our real competitive advantage. We possesse immense power of innovation, immagination and a desire to attract and retain the best; provide them with encouragement, stimulus, and make them feel that they are an integral part of the company's mission.
Purpose
Quality Assurance check for general inspection and post FAT inspection of various materialsprocured for KE Transmission and Distribution departments as per relevant Specifications and IECs. Dealing and Processing of under warranty claims from the aforementioned departments asper KE SOPs. Testing of materials for Chemical, Mechanical and Metallurgical analysis for different items of KE. Inspection scope of work includes inspections at vendor premises, to conduct FAT(factory acceptance testes) during which material is checked before delivery to KE locations.Material testing, chemical and mechanical is also performed and supervised. Assisting DGM fordepartmental strategic Goals and Objectives directed by HOCS.
Area of Responsibilities
On Time Inspection of Transmission, Distribution, TSW Production and Safety Material
1.Inspection of Material at vendor premises
2.Inspection of material delivered at all KE stores and storage sites
3.SAP data recording of all material parameters
4.Acceptance/rejection advice to GM after inspection of all material
5.Documentation of all necessary requirements stated in the PO against which material is delivered
6.Ensuring material meets quality standards
Factory acceptance test against inspection call and vendor education
1.Inspection of material at vendor works
2.Acceptance/rejection of material
3.Issuance of MAC/Rejection letters
4.Vendor improvement for ensuring better quality material and practices
5.Vendor education to ensure practices as per international standards
Coordination with Transformer and Switchgear Workshop
1.Inspection of transformers, trollies and switchgear of different rating
2.RCA of faulty and under warranty transformers, trollies and switchgear
3.Same day SAP posting for material availability to users
Coordination with Vendor for Under Warranty Rejection Items
1.Coordination with vendors for lifting of warranty claims of Transmission and distribution material.
2.Coordination with vendors for under warranty dispute and issues.
3.Coordination with vendors for repair /replacement of warranty claims of Transmission anddistribution material.
4.Vendor intimation of rejected material timely lifting.
5.Vendor follow-up for lifting of pending material.
6.Issuance of legal letters to vendor who have not lifted rejected material on time.
Materials Testing
1.Inhouse and external lab chemical composition and chemical purity testing material delivered at KEstores.
2.Inhouse and external lab chemical composition and chemical purity testing material used by KEdepartment.
Requirements
BE Electrical/Electronics/Mechanical
Minimum 2-3 Years of Experience
KE provides equal employment opportunity (EEO) to all persons regardless of age, color, origin, physical or mental disability, race, religion, creed, gender, marital status, status with regard to public assistance or any other characteristic protected by federal, state or local laws.
Women and persons with disabilities are encouraged to apply. Role suitability for PWDs will be assessed in accordance with HSE standards.